Customization: | Available |
---|---|
Year: | 2019 |
Working Hours: | 866hours |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Experience higher performance and lower fuel consumption with the excavators from Henan Yun Wa Machinery and Equipment Co., Ltd. Standard Cat technology reduces operator fatigue and operating costs by up to 45%, including gas consumption and routine maintenance.
Compared to the Cat 349D2 excavator, our excavators boast a 25% improvement in fuel efficiency, allowing more work to be done with each unit of fuel. The new high-efficiency hydraulic fan cools the engine on demand, reducing gas fuel consumption, while the reversing function keeps the cooler core clean.
Our excavators are designed to handle temperature challenges, operating in high temperatures up to 52ºC (125ºF) and starting in temperatures as low as -18ºC (0ºF), ensuring uninterrupted work.
Contact us today to learn more about our advanced excavator technology!
Brand |
Model |
Year |
Operating mass |
Bucket capacity |
Working Hours |
Engine Brand |
Engine Power |
Country of Origin |
Remark |
CAT |
CAT349 |
2019 |
47,500kg |
3.2m³ |
\ |
C13 |
303Kw |
CHINA |
/ |
Explore our affordable, high-performance Cat349 excavator with advanced technology. Reliable seller offering top-notch features. Don't miss out!
With a focus on Heavy Industry Construction Equipment for over 20 years, our company is dedicated to providing high-quality products. Our departments include Marketing, Purchasing, Technical Maintenance, and Logistics and Transportation, ensuring a seamless experience for our customers.
At Henan Yun Wa Machinery and Equipment Co., Ltd., we are committed to delivering top-notch construction equipment to customers worldwide. Trust us for all your heavy industry needs.
Payment: We accept T/T (30% deposit + 70% balance), with other payment options available for negotiation.
Price and Quality: Our machines are affordable and come in excellent working condition.
Delivery Time: Your order will be delivered within 8 working days after receiving the deposit.