Customization: | Available |
---|---|
Year: | 2019 |
Working Hours: | 866hours |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Experience higher performance and lower fuel consumption with the innovative technology offered by Henan Yun Wa Machinery and Equipment Co., Ltd. Standard Cat technology reduces operator fatigue, saves on operating costs, and improves efficiency by up to 45%.
Compared to the Cat 349D2 excavator, fuel efficiency is enhanced by 25%, allowing for more work to be done with each unit of fuel. The new high-efficiency hydraulic fan helps cool the engine on demand, reducing gas fuel consumption. The reversing function ensures easy maintenance of the cooler core.
This excavator is designed to handle temperature challenges, allowing it to operate in high temperatures up to 52ºC (125ºF) and start in cold temperatures as low as -18ºC (0ºF).
Experience the power and reliability of our excavator for your construction needs!
Brand |
Model |
Year |
Operating mass |
Bucket capacity |
Working Hours |
Engine Brand |
Engine Power |
Country of Origin |
Remark |
CAT |
CAT349 |
2019 |
47,500kg |
3.2m³ |
\ |
C13 |
303Kw |
CHINA |
/ |
DOOSAN Cat349 Excavator: Explore our top-quality, high-performance excavator with advanced features at an affordable price. Compare models now!
With over 20 years of experience in Heavy Industry Construction Equipment, our company is dedicated to providing high-quality products. Our departments include Marketing, Purchasing, Technical Maintenance, and Logistics and Transportation, all working together to ensure customer satisfaction.
At Henan Yun Wa Machinery and Equipment Co., Ltd., we believe in delivering top-notch equipment that meets the needs of our clients. Trust us for all your construction equipment requirements.
1. Payment: We accept T/T (30% deposit + 70% balance), and other payment methods can be negotiated.
2. Price and Quality: Our machines are affordable and come in excellent working condition.
3. Delivery Time: Your order will be delivered within 8 working days after receiving the deposit.